Rig Mast Moving System,Land Rig Mover,China Rig Moving Equipment Supplier oilfield equipment by ZYT Petroleum Machinery

Rig Mast Moving Equipment

Rig Mast Moving System,Land Rig Mover,China Rig Moving Equipment Supplier oilfield equipment by ZYT Petroleum Machinery
This rig mast moving system for derrick can transport the whole derrick system of ZJ40/50/70/90 drilling rig at one time. This rig mast moving system is equipped with front bracket of mast, hanging beam and binding beam of traveling hook and trailer of mast.
The use of this rig moving system for derrick can greatly reduce transportation times, save times and cost and improves working efficiency.
As a rig moving system supplier in China, our land rig moving system is an ideal equipment to move rig systems.


Features

It can transport the whole derrick rig moving system of ZJ40/50/70/90 drilling rigs.

Applications

Rig Mast Moving System,Land Rig Mover,China Rig Moving Equipment Supplier is engineered for moving of the rig mast and substructure as a single lifted unit.

- Primary use: specialized hydraulic lifting system for transporting the mast and substructure without dismantling them.
- Built for reliable daily operation in demanding onshore oil and gas environments across the Middle East, Central Asia, Africa, and Southeast Asia.
- used for rig moves where the mast can be transported upright or semi-assembled, saving rig-up time.

FAQs

Q: How long does a typical rig move take with this system?
A: Most short moves between adjacent well pads can be completed in 4-8 hours, compared to days with conventional disassembly.

Q: Is this system compatible with my existing rig?
A: Most land rigs can be retrofitted with a moving system; we just need the rig dimensions and weight to design the right configuration.

Q: How many people are needed to operate the moving system?
A: A 4-person crew can operate the entire system, with one operator controlling the hydraulic power unit.

Parameters

Basic performance Design parameter
Max total weight of drilling rig(t) 80~150
Max moving capacity of drilling rig solid moving system (t) 100~180
Min clearance from ground (mm) 600
Max moving speed(km/h) 10km/h
Width of application road(mm) 11000
Temperature of application environment(℃) -17~55

Hot Products